|
The
71,440 s.f. warehouse expansion structure was designed using structural
steel and insulated freezer panels. This project included a 250,000
gallon underground water reservoir, 6 bay loading dock, and a Ff-50
high tolerance concrete floor.
Location:
Fitchburg, WI
Engineer: Severn Engineering
Project Completion: February, 2001
Contact: John Leja
|